DEPLOYDatabase

Revision history

MIT CSAIL x Pegatron (Physically Intelligent Robots) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to MIT CSAIL x Pegatron (Physically Intelligent Robots)

Recorded posture

  • First recorded event: 2025-10-01
  • Last material change: 2025-10-01

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/mit-csail-x-pegatron-physically-intelligent-robots/history.md + REST /v1/partnerships/344fdf56-05f5-4178-9acd-10c90b35a966/history.