Revision history
Nimble x FedEx revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2024-10-01
- Last material change: 2024-10-01
Material events (1)
- 2024-10-01: created (source: https://nimble.ai/news/nimble-closes-106-million-series-c-funding-round-at-1b-valuation-scales-fully-autonomous-fulfillment-with-fedex) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/nimble-x-fedex/history.md + REST /v1/partnerships/03b76656-213d-4b6b-bfe3-00af2c687a3a/history.