Revision history
Nuro x Uber x Lucid Robotaxi revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-06-17
- Last material change: 2026-06-17
Material events (1)
- 2026-06-17: created (source: https://www.nuro.ai/blog/uber-nuro-and-lucid-to-bring-robotaxi-service-to-houston-in-2027) (reported)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/nuro-x-uber-x-lucid-robotaxi/history.md + REST /v1/partnerships/e9d0b6cb-0f85-48a9-9a01-fcd6a409e0c2/history.