Revision history
NVIDIA x LG Group (Humanoid Robots) revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-06-08
- Last material change: 2026-06-08
Material events (1)
- 2026-06-08: created (source: https://www.reuters.com/world/asia-pacific/nvidia-ceo-says-company-is-working-with-lg-humanoid-robots-data-centers-2026-06-08/) (reported)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/nvidia-x-lg-group-humanoid-robots/history.md + REST /v1/partnerships/b1064638-2ffc-4c61-a6db-b3b0ed63a088/history.