DEPLOYDatabase

Revision history

QTS Data Centers x Alliant Energy (Wisconsin Renewable Energy) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to QTS Data Centers x Alliant Energy (Wisconsin Renewable Energy)

Recorded posture

  • First recorded event: 2025-10-30
  • Last material change: 2025-10-30

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/qts-data-centers-x-alliant-energy-wisconsin-renewable-energy/history.md + REST /v1/partnerships/bba0c645-bd24-43ab-a41b-933b1017c69c/history.