Revision history
Saronic x US Navy Corsair ASV Production revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-02-15
- Last material change: 2026-02-15
Material events (1)
- 2026-02-15: created (source: https://www.fastcompany.com/91503485/saronic-most-innovative-companies-2026) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/saronic-x-us-navy-corsair-asv-production/history.md + REST /v1/partnerships/af2ca77e-33f0-42f6-b191-489e3fd6f3b5/history.