DEPLOYDatabase

Revision history

Tangram Vision x Saronic Technologies revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Tangram Vision x Saronic Technologies

Recorded posture

  • First recorded event: 2025-11-12
  • Last material change: 2025-11-12

Material events (1)

  • 2025-11-12: created (source: https://www.tangramvision.com/case-studies/scaling-autonomous-maritime-systems-how-saronic-technologies-accelerated-production-with-metrical-enterprise) (verified)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/tangram-vision-x-saronic-technologies/history.md + REST /v1/partnerships/9f5ce74e-985b-44c3-ba50-3ba979112bcc/history.