DEPLOYDatabase

Revision history

Tangram Vision x Venturi Astrolab revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Tangram Vision x Venturi Astrolab

Recorded posture

  • First recorded event: 2026-02-06
  • Last material change: 2026-02-06

Material events (1)

  • 2026-02-06: created (source: https://www.tangramvision.com/case-studies/building-the-lunar-economy) (verified)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/tangram-vision-x-venturi-astrolab/history.md + REST /v1/partnerships/ff9771b5-835b-433b-8df0-2938846d0e42/history.