DEPLOYDatabase

Revision history

Uber x Rivian robotaxi manufacturing deal revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Uber x Rivian robotaxi manufacturing deal

Recorded posture

  • First recorded event: 2026-03-19
  • Last material change: 2026-03-19

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/uber-x-rivian-robotaxi-manufacturing-deal/history.md + REST /v1/partnerships/51082590-d736-45ac-8948-0a0a7941f7a3/history.