Revision history
WeRide x Uber revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2025-05-05
- Last material change: 2025-05-05
Material events (1)
- 2025-05-05: created set to Partnership expansion: WeRide robotaxis to 15 more cities via Uber app; +$100M Uber equity investment (source: https://ir.weride.ai/news-releases/news-release-details/weride-announces-plan-expand-commercial-robotaxi-services-15) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/weride-uber-robotaxi-expansion-2025/history.md + REST /v1/partnerships/84dcf489-7541-4293-b3c5-45ac5355d08f/history.