DEPLOYDatabase

Revision history

CPUC Phase I Driverless Deployment AL No.1 (other) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Regulatory filing

Back to CPUC Phase I Driverless Deployment AL No.1 (other)

Recorded posture

  • First recorded event: 2022-06-02
  • Last material change: 2022-06-02

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.