DEPLOYThe reference layer for physical AI

Revision history

Leju Robotics revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Company

Back to Leju Robotics

Recorded posture

  • First recorded event: 2026-05-25
  • Last material change: 2026-05-25

Material events (1)

  • 2026-05-25: created (source: baseline:arc-g)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date. To restate a recorded change, write a new event through the updateEntityField chokepoint.

Machine-readable: /companies/leju-robotics/history.md + REST /v1/companies/7c47948b-6e07-497b-8954-288ae920e751/history.