Data center comparison
Cologix Johnstown Campus vs Savion Energy Pastures campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Cologix Johnstown Campus | Savion Energy Pastures campus | |
|---|---|---|
| Announced capacity | 0.80 GW | not recorded |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 0.80 GW | not recorded |
| Lifecycle | announced | announced |
| Developer | Cologix | Savion |
| Location | Johnstown, Ohio, United States | Harrison County, Ohio, United States |
| Grid | PJM | not recorded |
| Acreage | 154 acres | 8,400 acres |
On the map
Common questions
Which is further along, Cologix Johnstown Campus or Savion Energy Pastures campus?
Cologix Johnstown Campus is announced; Savion Energy Pastures campus is announced. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Cologix Johnstown Campus and Savion Energy Pastures campus?
Cologix Johnstown Campus is in Johnstown, Ohio, United States; Savion Energy Pastures campus is in Harrison County, Ohio, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.