Savion Energy Pastures campus

Savion Energy Pastures campus is a tracked AI data center campus in Ohio, Harrison County. Savion presented plans to Harrison County commissioners for an 8,400-acre Energy Pastures campus combining a data center, natural gas generation, solar and energy storage on privately owned reclaimed coal mine land and g

Announced · Savion · Private land · Harrison County, Ohio, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Savion Energy Pastures campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Savion

Developer

On the data center map

Every tracked data center is on this map, centered on Savion Energy Pastures campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterOhio(143)

The deal

developer
Savion

Power

Power source
mixed
Interconnection

Energy Pastures front-of-the-meter gas, 1.91 GW gas, Announced.

Energy Pastures phase 1 behind-the-meter gas, 0.64 GW gas, Announced.

Energy Pastures solar, 0.40 GW solar, Announced.

County water status: Extreme drought (D3) in Harrison County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Savion Energy Pastures campus sits on private land in Ohio, Harrison County. It draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    party added
    developer: Savion
  2. Nov 2026
    Current: Announced

Sources

7bd4c03c-3b63-455a-b6f7-13cca501de97 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Savion Energy Pastures campus?
Savion Energy Pastures campus is an AI data center campus tracked on the DEPLOY registry, located in Harrison County. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Savion Energy Pastures campus?
Savion is recorded as a party to Savion Energy Pastures campus on the DEPLOY registry.
Is Savion Energy Pastures campus operating yet?
As of the most recent verification on the DEPLOY registry, Savion Energy Pastures campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Savion Energy Pastures campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Savion Energy Pastures campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Savion Energy Pastures campus: AI data center campus record. Retrieved November 27, 2026, from https://registry.deploy.report/datacenters/savion-energy-pastures-campus-harrison-county-ohio

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces