Project Flyer is an AI data center campus developed by Panattoni Data Centers in Ohio, Union, Ohio. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · Panattoni Data Centers · Union, Ohio, Ohio, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2026-11-23 | claimed | company filing |
Key facts
Lifecycle
Announced
Energized
Panattoni Data Centers
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Project Flyer. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterOhio(143)
The deal
- developer
- Panattoni Data Centers
Power
- Interconnection
County water status: Abnormally dry (D0) in Union County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Project Flyer is in Ohio, Union, Ohio. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.3
- Nov 2026Current: Announced
Sources
- Project Flyer Community Frequently Asked Questions · Panattoni Data Centers
- EXCLUSIVE: City of Union announces plans for Data Center near Dayton Airport · Tippecanoe Gazette
c54c356b-0efb-4280-bcf2-80bdd6d37363 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Project Flyer?
How much power will Project Flyer use?
Who is building Project Flyer?
Is Project Flyer operating yet?
How verified is the data on Project Flyer?
Deploy Watch
Track Project Flyer on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Project Flyer: AI data center campus record. Retrieved November 27, 2026, from https://registry.deploy.report/datacenters/panattoni-project-flyer-union-ohio
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/panattoni-project-flyer-union-ohio.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/panattoni-project-flyer-union-ohio
- Data documentation: /data
- Query this programmatically: Deploy MCP