Every tracked AI data center campus interconnecting to the NYISO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
5
Announced (combined)
1.15 GW
Energized (combined)
0.10 GW
Grid demand now
20.8 GW
The New York (NYISO) grid is pulling 20.8 GW right now (EIA-930, 2026-08-25 23:00). If every announced campus on this grid energized fully, their combined 1.15 GW would be 5.5% of the grid's current load. Announced numbers are claims, not built capacity; see the methodology.
Campuses on this grid
| Lake Mariner Data Campus | Barker | partially energized | 0.75 | 0.10 |
| Cayuga Data Campus | Lansing | announced | 0.40 | — |
| IBM Quantum System One at Rensselaer Polytechnic Institute | Troy, New York, USA | energized | — | — |
| OQC New York Quantum-AI Data Centre | New York, New York, USA | energized | — | — |
| IBM Quantum Data Center Poughkeepsie | Poughkeepsie, New York, USA | energized | — | — |