DEPLOYDatabase

Grid operator

AI data centers on the NYISO grid

Every tracked AI data center campus interconnecting to the NYISO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.


On this grid

Campuses
5
Announced (combined)
1.15 GW
Energized (combined)
0.10 GW
Grid demand now
20.8 GW

The New York (NYISO) grid is pulling 20.8 GW right now (EIA-930, 2026-08-25 23:00). If every announced campus on this grid energized fully, their combined 1.15 GW would be 5.5% of the grid's current load. Announced numbers are claims, not built capacity; see the methodology.

Campuses on this grid

AI data center campuses on the NYISO grid
Lake Mariner Data CampusBarkerpartially energized0.750.10
Cayuga Data CampusLansingannounced0.40
IBM Quantum System One at Rensselaer Polytechnic InstituteTroy, New York, USAenergized
OQC New York Quantum-AI Data CentreNew York, New York, USAenergized
IBM Quantum Data Center PoughkeepsiePoughkeepsie, New York, USAenergized

See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.