Grid operator
AI data centers on the TEPCO grid
Every tracked AI data center campus interconnecting to the TEPCO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
2
Announced (combined)
0 GW
Energized (combined)
0 GW
Campuses on this grid
| PDG TH1 Tokyo Hyperscale Data Centre | Inzai | announced | — | — |
| PDG TY1 Tokyo Data Centre | Saitama | energized | — | — |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.