DEPLOYDatabase

Data center campus

PDG TH1 Tokyo Hyperscale Data Centre

PDG TH1 Tokyo Hyperscale Data Centre is a tracked AI data center campus in Inzai.

Announced · Princeton Digital Group · TEPCO · Inzai, Japan (JGSDF Trials)


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
PDG TH1 Tokyo Hyperscale Data Centre capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
96 MW (96 MW IT hyperscale campus announced in Chiba/Inzai cluster)
Grid operator
TEPCO

On the data center map

No mappable coordinate is recorded for PDG TH1 Tokyo Hyperscale Data Centre yet. Location: Inzai.

The deal

Power

Power source
grid
Grid operator
TEPCO
Interconnection

Why here

PDG TH1 Tokyo Hyperscale Data Centre is in Inzai. It connects to the TEPCO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

818513a5-6568-419a-9e5a-8f51c06ebdfa · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PDG TH1 Tokyo Hyperscale Data Centre?
PDG TH1 Tokyo Hyperscale Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Inzai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building PDG TH1 Tokyo Hyperscale Data Centre?
Princeton Digital Group is recorded as a party to PDG TH1 Tokyo Hyperscale Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.
Is PDG TH1 Tokyo Hyperscale Data Centre operating yet?
As of the most recent verification on the DEPLOY registry, PDG TH1 Tokyo Hyperscale Data Centre is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PDG TH1 Tokyo Hyperscale Data Centre?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PDG TH1 Tokyo Hyperscale Data Centre on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PDG TH1 Tokyo Hyperscale Data Centre: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/princeton-digital-group-pdg-th1-tokyo-hyperscale-data-centre

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces