Grid operator
AI data centers on the TNB grid
Every tracked AI data center campus interconnecting to the TNB grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
2
Announced (combined)
0 GW
Energized (combined)
0 GW
Campuses on this grid
| DayOne Nusajaya Tech Park (NTP) Johor Campus | Nusajaya, Johor | partially energized | — | — |
| PDG JH1 Sedenak Data Centre | Kulai | under construction | — | — |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.