DayOne Nusajaya Tech Park (NTP) Johor Campus

DayOne Nusajaya Tech Park (NTP) Johor Campus is a tracked AI data center campus in Nusajaya, Johor.

Partially energized · GDS Holdings · TNB · Nusajaya, Johor, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
DayOne Nusajaya Tech Park (NTP) Johor Campus capacity claims
Source

Key facts

0 GW

Energized

GDS Holdings

Developer

Malaysia

Location

TNB

Grid

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
300 MW (~300 MW committed at full build across multiple buildings (DayOne / GDS International flagship))
Named tenants
ByteDance
Grid operator
TNB
Serving utility
Tenaga Nasional

On the data center map

No mappable coordinate is recorded for DayOne Nusajaya Tech Park (NTP) Johor Campus yet. Location: Nusajaya, Johor.

The deal

developer
GDS Holdings

Power

Power source
grid
Grid operator
TNB
Interconnection

Why here

DayOne Nusajaya Tech Park (NTP) Johor Campus is in Nusajaya, Johor. It connects to the TNB grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

27136540-5af7-474a-b632-52e78d167f94 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is DayOne Nusajaya Tech Park (NTP) Johor Campus?
DayOne Nusajaya Tech Park (NTP) Johor Campus is an AI data center campus tracked on the DEPLOY registry, located in Nusajaya, Johor. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building DayOne Nusajaya Tech Park (NTP) Johor Campus?
GDS Holdings is recorded as a party to DayOne Nusajaya Tech Park (NTP) Johor Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is DayOne Nusajaya Tech Park (NTP) Johor Campus operating yet?
As of the most recent verification on the DEPLOY registry, DayOne Nusajaya Tech Park (NTP) Johor Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on DayOne Nusajaya Tech Park (NTP) Johor Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track DayOne Nusajaya Tech Park (NTP) Johor Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). DayOne Nusajaya Tech Park (NTP) Johor Campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/gds-holdings-dayone-nusajaya-tech-park-ntp-johor-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces