Data center campus

DayOne Batam Nongsa Digital Park Campus

DayOne Batam Nongsa Digital Park Campus is a tracked AI data center campus in Batam.

Partially energized · GDS Holdings · Batam


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Expected online: 2025 (full build-out). 11 months past the claimed date, with no energized capacity on record..

DayOne Batam Nongsa Digital Park Campus capacity claims
Source

Key facts

0 GW

Energized

GDS Holdings

Developer

Batam

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity (announced)
About 72 MW Phase 1

On the data center map

No mappable coordinate is recorded for DayOne Batam Nongsa Digital Park Campus yet. Location: Batam.

The story of DayOne Batam Nongsa Digital Park Campus
Grid
due 2025

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

The deal

developer
GDS Holdings

Power

Power source
grid
Interconnection

Why here

DayOne Batam Nongsa Digital Park Campus is in Batam. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Nov 2026
    lifecycle changed
    intake proposal 913a6731-5ab8-4b86-a255-f18e3add8318
  2. Nov 2026
    Current: Partially energized

Sources

483d035a-f922-4feb-97c6-75b23b3e5e51 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is DayOne Batam Nongsa Digital Park Campus?
DayOne Batam Nongsa Digital Park Campus is an AI data center campus tracked on the DEPLOY registry, located in Batam. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building DayOne Batam Nongsa Digital Park Campus?
GDS Holdings is recorded as a party to DayOne Batam Nongsa Digital Park Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is DayOne Batam Nongsa Digital Park Campus operating yet?
As of the most recent verification on the DEPLOY registry, DayOne Batam Nongsa Digital Park Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on DayOne Batam Nongsa Digital Park Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track DayOne Batam Nongsa Digital Park Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). DayOne Batam Nongsa Digital Park Campus: AI data center campus record. Retrieved November 26, 2026, from https://registry.deploy.report/datacenters/gds-holdings-dayone-batam-nongsa-digital-park-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces