Deployment
ABB IRB 6700 at Västerås
Heavy-duty industrial robot for material handling and spot welding. 150–300kg payload, 2.6–3.2m reach.
ABB IRB 6700 by ABB Robotics · Catalog entry · 1 source · not yet field-verified
Machine-readable surfaces
- Markdown mirror: /deployments/abb-vaesteraas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/85096a51-70e7-4fc0-8afb-436d9c964a76
- Data documentation: /data
- Query this programmatically: Deploy MCP
IRB 6700 deployed in automotive, foundry, and general industry globally. ABB flagship heavy robot.
- Trust tier
- Catalog entry · 1 source · not yet field-verified
- Last updated
- 2026-06-08
- Model
- ABB IRB 6700
- Company
- ABB Robotics
- Location
- Västerås
- Status
- operational
- ID
85096a51-70e7-4fc0-8afb-436d9c964a76
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-06-08
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-06-08
Maturity + lifecycle
Lifecycle: active
Architectural position
Cohort: industrial_robot
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for ABB IRB 6700 at Västerås.Common questions
- What is the ABB IRB 6700 deployment at Västerås?
- ABB IRB 6700, built by ABB Robotics, is recorded as a deployment at Västerås on the DEPLOY registry. ABB Robotics operates the deployment directly.
- Who operates ABB IRB 6700 at Västerås?
- ABB Robotics, the manufacturer of ABB IRB 6700, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
- Have there been incidents at the ABB IRB 6700 deployment at Västerås?
- No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.