Deployment
IronBOT at Port St. Lucie
Advanced Construction Robotics' IronBOT is a rebar-placing robot that lifts, carries, singulates, and self-places bundles of transverse and longitudinal rebar for bridge-deck construction, at a placement rate of over 5,000 pounds per hour.
IronBOT by Advanced Construction Robotics · Catalog entry · 2 sources · not yet field-verified · Construction robots
Recent coverage
- ACR Launches The World's First Rebar Lifting, Carrying & Placing Robot @CONEXPO: The IronBOT Robot - For Construction ProsGoogle News · 2026-06-01
- Top 10: Construction Robotics - Construction DigitalGoogle News · 2026-03-25
- Advanced Construction Robotics TyBOT is now available for purchase - The Robot ReportGoogle News · 2024-09-10
Advanced Construction Robotics deployed IronBOT on its first field project: the West Boulevard Bridge in Port St. Lucie, Florida, with bridge specialty contractor Shelby Erectors. IronBOT lifted and placed rebar bundles on the bridge deck, roughly halving the rebar installation schedule (reported cut from about 14 days to 7). Shelby Erectors is the on-site contractor; Advanced Construction Robotics operated/supported the robot.
Key facts
- Site
- West Boulevard Bridge, Port St. Lucie, Florida
- Contractor
- Shelby Erectors (bridge specialty contractor)
- Task
- Lifting and placing rebar bundles on the bridge deck
- Result
- Rebar install schedule roughly halved (about 14 days to 7)
- Milestone
- IronBOT's inaugural field project
Exposure
- Customer segment
- logistics
- Scale tier
- pilot lt10
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for IronBOT at Port St. Lucie.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 2 sources · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- IronBOT
- Location
- United States/Florida/Port St. Lucie
- Operator
- Advanced Construction Robotics
- Status
- pilot
- Operator type
- maker operated
- Scale at site
- 2 to 10 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2024-02-01
- ID
b016d193-2aeb-4857-ba9d-b79affa26775
Timeline
- Feb 2024First recordedIronBOT first documented operating at Port St. Lucie.
- Aug 2026Current status: pilot, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
IronBOT operates in Port St. Lucie. Explore the full verified map:
Sources (2)
Methodology: Verified · 2 sources (1 primary) · last reviewed 2026-08-21
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- secondary-trade-publication
- Trade publication
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for IronBOT at Port St. Lucie.Common questions
What is the IronBOT deployment at Port St. Lucie?
Who operates IronBOT at Port St. Lucie?
When did the IronBOT deployment at Port St. Lucie go live?
Have there been incidents at the IronBOT deployment at Port St. Lucie?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/acr-ironbot-port-st-lucie-bridge.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/b016d193-2aeb-4857-ba9d-b79affa26775
- Data documentation: /data
- Query this programmatically: Deploy MCP