Deployment
AMD Instinct MI300 at Livermore, California, USA (RK Logistics)
AMD Instinct MI300 series GPU accelerators for AI training and inference workloads in robotics applications.
AMD Instinct MI300 by AMD · Catalog entry · 1 source · not yet field-verified
El Capitan at LLNL, 1.742 exaFLOPs, 43,808 MI300A GPUs, world's fastest supercomputer.
Safety record
No incidents on record for AMD Instinct MI300 at Livermore, California, USA (RK Logistics).
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-09-12
- Model
- AMD Instinct MI300
- Company
- AMD
- Status
- operational
- First seen
- 2024-11-01
- ID
531abac7-19f9-4c30-b8d2-39d3ef1719d6
Timeline
- Nov 2024First recordedAMD Instinct MI300 first documented operating at Livermore, California, USA (RK Logistics).
- Sep 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Operates worldwide
AMD Instinct MI300 is deployed globally rather than at a single verified site, so there is no map pin.
AMD Instinct MI300 operates in Livermore, California, USA (RK Logistics). Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-09-12
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-09-12
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- knowledge-base
- Knowledge base
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for AMD Instinct MI300 at Livermore, California, USA (RK Logistics).Common questions
What is the AMD Instinct MI300 deployment at Livermore, California, USA (RK Logistics)?
Who operates AMD Instinct MI300 at Livermore, California, USA (RK Logistics)?
When did the AMD Instinct MI300 deployment at Livermore, California, USA (RK Logistics) go live?
Have there been incidents at the AMD Instinct MI300 deployment at Livermore, California, USA (RK Logistics)?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/amd-instinct-mi300-livermore-california-usa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/531abac7-19f9-4c30-b8d2-39d3ef1719d6
- Data documentation: /data
- Query this programmatically: Deploy MCP