Deployment
AMP Cortex at Commerce City, Colorado, USA
AMP Cortex is AMP Robotics' high-speed robotic sorting system that uses the AMP Neuron AI vision platform to identify and pick recyclables (by material, color, and form) from mixed-waste conveyor streams in material recovery facilities.
AMP Cortex by AMP Robotics · Unverified
Machine-readable surfaces
- Markdown mirror: /deployments/amp-cortex-commerce-city-colorado-usa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/6269be1f-62a4-4144-a7e9-34d97ef96877
- Data documentation: /data
- Query this programmatically: Deploy MCP
AMP operates a first-of-its-kind fully integrated AI sorting facility for Waste Connections in Commerce City, Colorado, processing 62,000 tons per year. Opening early 2026.
Key facts
- Capacity
- 62,000 tons per year
- Operator
- Waste Connections
Safety record
No incidents on record for AMP Cortex at Commerce City, Colorado, USA.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverified
- Last updated
- 2026-07-03
- Model
- AMP Cortex
- Company
- AMP Robotics
- Location
- Commerce City, Colorado, USA
- Status
- operational
- First seen
- 2025-06-01
- ID
6269be1f-62a4-4144-a7e9-34d97ef96877
Sources (1)
- AMP to Operate Waste Connections Recycling Facility with AI · https://ampsortation.com/articles/first-of-its-kind-facility-featuring-fully-integra · 2025-06-01
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-07-03
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-07-03
Maturity + lifecycle
Lifecycle: active
Architectural position
Cohort: industrial_robot
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for AMP Cortex at Commerce City, Colorado, USA.Common questions
- What is the AMP Cortex deployment at Commerce City, Colorado, USA?
- AMP Cortex, built by AMP Robotics, is recorded as a deployment at Commerce City, Colorado, USA on the DEPLOY registry. AMP Robotics operates the deployment directly.
- Who operates AMP Cortex at Commerce City, Colorado, USA?
- AMP Robotics, the manufacturer of AMP Cortex, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
- When did the AMP Cortex deployment at Commerce City, Colorado, USA go live?
- The deployment is recorded as starting June 1, 2025 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
- Have there been incidents at the AMP Cortex deployment at Commerce City, Colorado, USA?
- No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.
- Is AMP Cortex at Commerce City, Colorado, USA safe?
- AMP Cortex at Commerce City, Colorado, USA has no incidents on record in the DEPLOY registry. This does not constitute a safety guarantee; it reflects the incidents DEPLOY has tracked and verified to date.
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.