DEPLOYDatabase

Deployment

Base Power Home Battery at Texas, USA

Residential home battery system from Base Power. Part of a virtual power plant network. Leased at $19/month.

Base Power Home Battery by Base Power · Unverified


Base Power has deployed 500+ MWh of residential batteries across Texas. 30,000+ homes. Factory 1 in Austin producing thousands of systems per month. Core battery (39.2 kWh) deployed with 9/month lease.

Safety record

No incidents on record for Base Power Home Battery at Texas, USA.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Unverifiedhow tiers work →
Last updated
2026-08-19
Company
Base Power
Location
Texas, USA
Status
operational
First seen
2024-01-01
ID
0042b72c-b7b7-43fd-8438-a179f79a4a7f

Timeline

  1. Jan 2024
    First recorded
    Base Power Home Battery first documented operating at Texas, USA.
  2. Aug 2026
    Current status: operational
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

Base Power Home Battery is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

Base Power Home Battery operates in Texas, USA. Explore the full verified map:

Sources (1)

  1. Base Power raises B to roll out its giant new home battery · https://electrek.co/2026/08/03/base-power-raises-1b-to-roll-out-its-giant-new-home-battery/ · 2024-01-01
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-19

Verification posture

Unreviewed

Low confidence

Review state

Stable

Last reviewed 2026-08-19

Maturity + lifecycle

Maturity stage: commercial

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Base Power Home Battery at Texas, USA.

Common questions

What is the Base Power Home Battery deployment at Texas, USA?
Base Power Home Battery, built by Base Power, is recorded as a deployment at Texas, USA on the DEPLOY registry. Base Power operates the deployment directly.
Who operates Base Power Home Battery at Texas, USA?
Base Power, the manufacturer of Base Power Home Battery, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the Base Power Home Battery deployment at Texas, USA go live?
The deployment is recorded as starting January 1, 2024 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Have there been incidents at the Base Power Home Battery deployment at Texas, USA?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces