Deployment
ARA at East Anglia
The Ecorobotix ARA is an AI-powered ultra-high-precision plant-by-plant sprayer that targets weeds at roughly 6x6 cm resolution with millisecond timing, cutting herbicide use by up to 95%.
ARA by Ecorobotix · Catalog entry · 1 source · not yet field-verified · Agricultural robots
Recent coverage
- West Virginia PopCon brings together all types of fansWOWK 13 News · 2026-08-23
- Same Playbook, New Machine: How China Turned Its EV Boom Into a Robot ArmyRocking Robots · 2026-08-23
- COPPERTradingView · 2026-08-23
Vegetable Consultancy Services (VCS), an agronomy and contracting outfit across Norfolk, Suffolk, Cambridgeshire, Lincolnshire and Kent, ran roughly 1,000 hectares of ARA contracting and demonstration work in 2024, reporting chemical savings up to 96 percent and facilitating about 24 UK ARA sales. The de-facto UK rollout channel for ARA.
Key facts
- Operator
- Vegetable Consultancy Services (VCS)
- Scope
- ~1,000 ha contracting; ~24 UK sales
Exposure
- Customer segment
- agriculture
- Scale tier
- commercial 10 99
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for ARA at East Anglia.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- ARA
- Company
- Ecorobotix
- Location
- United Kingdom/East Anglia
- Operator
- Ecorobotix
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 11 to 100 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2024-01-01
- ID
26a90076-f885-4c1d-9c9f-1dd3d28bc789
Timeline
- Jan 2024First recordedARA first documented operating at East Anglia.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
ARA operates in East Anglia. Explore the full verified map:
Sources (1)
- Ecorobotix spot sprayer slashes chemical costs by over 90% · https://www.fwi.co.uk/machinery/technology/ecorobotix-spot-sprayer-slashes-chemical-costs-by-over-90 · 2024-07-22
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: agriculture
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for ARA at East Anglia.Common questions
What is the ARA deployment at East Anglia?
Who operates ARA at East Anglia?
When did the ARA deployment at East Anglia go live?
Have there been incidents at the ARA deployment at East Anglia?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/ecorobotix-ara-vcs-east-anglia.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/26a90076-f885-4c1d-9c9f-1dd3d28bc789
- Data documentation: /data
- Query this programmatically: Deploy MCP