Deployment
Epiroc Autonomous Haulage (LinkOA) at Roy Hill Mine
Epiroc's autonomous haulage offering, delivered with its ASI Mining subsidiary, converts mixed OEM haul-truck fleets to fully driverless operation. Early conversions used ASI Mining's Mobius; more recent conversions run Epiroc's LinkOA agnostic autonomy system. At Hancock Iron Ore's Roy Hill mine in the Pilbara, Epiroc converted the full 78-truck mixed fleet to driverless operation, described as the world's largest fully OEM-agnostic autonomous haulage operation.
Epiroc Autonomous Haulage (LinkOA) by Epiroc · Catalog entry · 1 source · not yet field-verified · Mining robots
Epiroc, with its ASI Mining subsidiary, converted the full 78-truck mixed haul fleet at Hancock Iron Ore's Roy Hill mine in the Pilbara to fully driverless operation, reaching the milestone in October 2025. More recent conversions run Epiroc's LinkOA agnostic autonomy system, described as the world's largest fully OEM-agnostic autonomous haulage operation. Roy Hill (Hancock Iron Ore) is the mine operator.
Key facts
- Operator
- Roy Hill (Hancock Iron Ore)
- Fleet converted
- 78 haul trucks, fully driverless
- Milestone
- October 2025; world's largest fully agnostic autonomous mine
Exposure
- Customer segment
- research
- Scale tier
- pilot lt10
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Epiroc Autonomous Haulage (LinkOA) at Roy Hill Mine.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Company
- Epiroc
- Location
- New Zealand/Pilbara/Roy Hill Mine
- Operator
- Epiroc
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 2 to 10 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2025-10-24
- ID
289b55a1-6c82-4834-9c71-35b06ca892e4
Timeline
- Oct 2025First recordedEpiroc Autonomous Haulage (LinkOA) first documented operating at Roy Hill Mine.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Epiroc Autonomous Haulage (LinkOA) operates in Roy Hill Mine. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: mining
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Epiroc Autonomous Haulage (LinkOA) at Roy Hill Mine.Common questions
What is the Epiroc Autonomous Haulage (LinkOA) deployment at Roy Hill Mine?
Who operates Epiroc Autonomous Haulage (LinkOA) at Roy Hill Mine?
When did the Epiroc Autonomous Haulage (LinkOA) deployment at Roy Hill Mine go live?
Have there been incidents at the Epiroc Autonomous Haulage (LinkOA) deployment at Roy Hill Mine?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/epiroc-linkoa-roy-hill.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/289b55a1-6c82-4834-9c71-35b06ca892e4
- Data documentation: /data
- Query this programmatically: Deploy MCP