DEPLOYDatabase

Deployment

Alice at Arlington, Washington, USA

Nine-passenger all-electric commuter aircraft. First flight September 27, 2022 at Moses Lake, WA. Cruise speed 250 kts (287 mph), maximum load 2,600 lbs, capacity for 2 pilots and 9 passengers. Development paused February 2025 — company laid off most staff and is seeking new funding. On indefinite pause as of 2025.

Alice by Eviation Aircraft · Catalog entry · 1 source · not yet field-verified · Drones


~300 aircraft on order ($2B+): Cape Air (75 LOI), Global Crossing Airlines (50), DHL Express (12 eCargo). Prototype stage, first deliveries targeted 2024-2027.

Safety record

No incidents on record for Alice at Arlington, Washington, USA.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Catalog entry · 1 source · not yet field-verifiedhow tiers work →
Last updated
2026-08-21
Model
Alice
Status
announced
First seen
2021-01-01
ID
a2ebdca5-acba-41ea-85d3-6e3a2a05bcac

Timeline

  1. Jan 2021
    First recorded
    Alice first documented operating at Arlington, Washington, USA.
  2. Aug 2026
    Current status: announced, reviewed
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

Alice is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

Alice operates in Arlington, Washington, USA. Explore the full verified map:

Sources (1)

  1. https://www.aerospacemanufacturinganddesign.com/news/eviation-alice-orders-surpass-2-billion/
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-08-21

Maturity + lifecycle

Maturity stage: prototype

Lifecycle: active

Architectural position

Cohort: aerial

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Alice at Arlington, Washington, USA.

Common questions

What is the Alice deployment at Arlington, Washington, USA?
Alice, built by Eviation Aircraft, is recorded as a deployment at Arlington, Washington, USA on the DEPLOY registry. Eviation Aircraft operates the deployment directly.
Who operates Alice at Arlington, Washington, USA?
Eviation Aircraft, the manufacturer of Alice, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the Alice deployment at Arlington, Washington, USA go live?
The deployment is recorded as starting January 1, 2021 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Is the Alice deployment at Arlington, Washington, USA still active?
As of the most recent verification on the DEPLOY registry, this deployment is announced but not yet operating.
Have there been incidents at the Alice deployment at Arlington, Washington, USA?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces