Deployment
TRX at Washington, D.C.
10-ton tracked modular robotic platform; two prototypes delivered to the US Army (Oct 2024) for the Robotic Combat Vehicle competition.
TRX by General Dynamics Land Systems · Catalog entry · 1 source · not yet field-verified · Defense UGV
Recent coverage
- S-MET & MUTT - General Dynamics Land SystemsBen Smith, Deploy Editor · 2024-01-01
- GDLS Gets 62 Million Deal for Robotic 'Mules' to Unburden SoldiersBen Smith, Deploy Editor · 2019-11-27
- General Dynamics Land Systems Wins 49M Army SMET Vehicle Development ContractBen Smith, Deploy Editor · 2019-11-26
TRX Leonidas, Epirus' Leonidas high-power microwave array integrated onto GDLS's Tracked Robot 10-ton, was displayed in Epirus' booth at AUSA 2025 in Washington, D.C., October 13-15.
Safety record
No incidents on record for TRX at Washington, D.C..
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-10-21
- Model
- TRX
- Status
- announced
- Location precision
- verified coordinates
- First seen
- 2025-10-13
- ID
648bd191-e399-42e7-bf54-84f92689c589
Timeline
- Oct 2025First recordedTRX first documented operating at Washington, D.C..
- Oct 2026Current status: announced, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
TRX operates in Washington, D.C.. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (1 primary) · last reviewed 2026-10-21
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-10-21
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: defense_ugv
Sources by quality tier
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for TRX at Washington, D.C..Common questions
What is the TRX deployment at Washington, D.C.?
Who operates TRX at Washington, D.C.?
When did the TRX deployment at Washington, D.C. go live?
Is the TRX deployment at Washington, D.C. still active?
Have there been incidents at the TRX deployment at Washington, D.C.?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/gdls-trx-washington-dc-usa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/648bd191-e399-42e7-bf54-84f92689c589
- Data documentation: /data
- Query this programmatically: Deploy MCP