Deployment
TRX at Washington D.C., USA (AUSA 2025)
10-ton tracked modular robotic platform; two prototypes delivered to the US Army (Oct 2024) for the Robotic Combat Vehicle competition.
TRX by General Dynamics Land Systems · Catalog entry · 1 source · not yet field-verified · Defense UGV
Recent coverage
- S-MET & MUTT - General Dynamics Land SystemsBen Smith, Deploy Editor · 2024-01-01
- GDLS Gets 62 Million Deal for Robotic 'Mules' to Unburden SoldiersBen Smith, Deploy Editor · 2019-11-27
- General Dynamics Land Systems Wins 49M Army SMET Vehicle Development ContractBen Smith, Deploy Editor · 2019-11-26
GDLS exhibited TRX at AUSA 2025 Annual Meeting & Exposition, October 13-15, 2025, in Washington D.C. TRX is a 10-ton hybrid-electric robotic combat vehicle with speeds up to 45 mph.
Safety record
No incidents on record for TRX at Washington D.C., USA (AUSA 2025).
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-09
- Model
- TRX
- Location
- Washington D.C., USA (AUSA 2025)
- Status
- announced
- First seen
- 2025-10-13
- ID
648bd191-e399-42e7-bf54-84f92689c589
Timeline
- Oct 2025First recordedTRX first documented operating at Washington D.C., USA (AUSA 2025).
- Aug 2026Current status: announced, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
TRX operates in Washington D.C., USA (AUSA 2025). Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-09
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-09
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: defense_ugv
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for TRX at Washington D.C., USA (AUSA 2025).Common questions
What is the TRX deployment at Washington D.C., USA (AUSA 2025)?
Who operates TRX at Washington D.C., USA (AUSA 2025)?
When did the TRX deployment at Washington D.C., USA (AUSA 2025) go live?
Is the TRX deployment at Washington D.C., USA (AUSA 2025) still active?
Have there been incidents at the TRX deployment at Washington D.C., USA (AUSA 2025)?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/gdls-trx-washington-dc-usa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/648bd191-e399-42e7-bf54-84f92689c589
- Data documentation: /data
- Query this programmatically: Deploy MCP