Deployment
Forge at Teesside, United Kingdom
Robotic microfactory platform combining design, structural engineering, regulatory compliance, robotics, and factory operations into one integrated digital workflow. Produces infrastructure components (e.g. high-strength concrete pipe support bases/sleepers) up to 3x faster than conventional construction. Deployed near project sites to reduce logistics. First microfactory (Forge I) launching in Flixborough near Scunthorpe, UK, in partnership with LKAB.
Forge by Hyperion Robotics · Unverified
Recent coverage
- Saronic and Samsung Heavy Industries forge U.S. shipbuilding alliance focused on autonomous vessels, AI and industrial capacityDefence Industry Europe · 2026-07-25
- Guardian Metal, Montana Mining Association forge US tungsten processing allianceMINING.com · 2026-07-10
- Before iOS 27, Don't Forget to Check Out These iOS 26.4 FeaturesCNET – Technology · 2026-07-09
Machine-readable surfaces
- Markdown mirror: /deployments/hyperion-forge-teesside-uk.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/4c09713b-2738-44ec-acae-0a9cc30b44af
- Data documentation: /data
- Query this programmatically: Deploy MCP
Costain East Coast Cluster project: Hyperion producing approximately 90 3D-printed concrete sleepers for 1.3km of onshore CO2 pipelines for the Northern Endurance Partnership carbon capture system. Manufactured at Forge I, deployed to Teesside.
Key facts
- Units
- 90 sleepers
Safety record
No incidents on record for Forge at Teesside, United Kingdom.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-07-26
- Model
- Forge
- Company
- Hyperion Robotics
- Location
- Teesside, United Kingdom
- Status
- operational
- First seen
- 2026-04-22
- ID
4c09713b-2738-44ec-acae-0a9cc30b44af
Timeline
- Apr 2026First recordedForge first documented operating at Teesside, United Kingdom.
- Jul 2026Current status: operationalLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Forge operates in Teesside, United Kingdom. Explore the full verified map:
Sources (1)
- Hyperion Robotics to deliver 3D printed concrete sleepers for Costain landmark East Coast Cluster project · https://www.hyperionrobotics.com/hyperion-robotics-delivers-3d-printed-concrete-sleepers-for-costains-landmark-east-coast-cluster-project/ · 2026-04-22
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-07-26
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-07-26
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Forge at Teesside, United Kingdom.Common questions
What is the Forge deployment at Teesside, United Kingdom?
Who operates Forge at Teesside, United Kingdom?
When did the Forge deployment at Teesside, United Kingdom go live?
Have there been incidents at the Forge deployment at Teesside, United Kingdom?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.