DEPLOYDatabase

Deployment

Scaled Robotics Progress Monitor at Bromley

Scaled Robotics' autonomous four-wheeled robot roams construction sites capturing 3D scans and panoramic photos, then compares the as-built data against the BIM model to flag discrepancies and track progress.

Scaled Robotics Progress Monitor by Scaled Robotics · Catalog entry · 1 source · not yet field-verified


Machine-readable surfaces

Contractor Kier trialled the Scaled Robotics mobile 3D-scanning progress-monitoring robot at its Harris Academy scheme (a roughly GBP 22m school build) in Bromley, Greater London, at fit-out stage. The robot generated a 3D site map compared against the BIM model for progress and quality monitoring.

Key facts

Site
Harris Academy scheme (about GBP 22m school build), Bromley, Greater London
Contractor
Kier
Task
3D site scanning compared to the BIM model (progress/QA monitoring)
Stage
Fit-out; trial

Safety record

No incidents on record for Scaled Robotics Progress Monitor at Bromley.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Catalog entry · 1 source · not yet field-verifiedhow tiers work →
Last updated
2026-07-12
Location
London/Bromley
Status
pilot
First seen
2018-12-01
ID
d400f090-44be-4eaf-97af-3149a9be9e8c

Timeline

  1. Dec 2018
    First recorded
    Scaled Robotics Progress Monitor first documented operating at Bromley.
  2. Jul 2026
    Current status: pilot, reviewed
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Scaled Robotics Progress Monitor operates in Bromley. Explore the full verified map:

Sources (1)

  1. https://constructionmanagement.co.uk/kier-trials-robot-onsite-hs-monitor/ · 2018-12-01
Methodology: Verified · 1 source (no primary) · last reviewed 2026-07-12

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-07-12

Maturity + lifecycle

Lifecycle: active

Architectural position

Cohort: construction

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Scaled Robotics Progress Monitor at Bromley.

Common questions

What is the Scaled Robotics Progress Monitor deployment at Bromley?
Scaled Robotics Progress Monitor, built by Scaled Robotics, is recorded as a deployment at Bromley on the DEPLOY registry. Scaled Robotics operates the deployment directly.
Who operates Scaled Robotics Progress Monitor at Bromley?
Scaled Robotics, the manufacturer of Scaled Robotics Progress Monitor, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the Scaled Robotics Progress Monitor deployment at Bromley go live?
The deployment is recorded as starting December 1, 2018 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Have there been incidents at the Scaled Robotics Progress Monitor deployment at Bromley?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.