Deployment
Scaled Robotics Progress Monitor at Bromley
Scaled Robotics' autonomous four-wheeled robot roams construction sites capturing 3D scans and panoramic photos, then compares the as-built data against the BIM model to flag discrepancies and track progress.
Scaled Robotics Progress Monitor by Scaled Robotics · Catalog entry · 1 source · not yet field-verified
Machine-readable surfaces
- Markdown mirror: /deployments/scaled-robotics-monitor-harris-academy-bromley.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/d400f090-44be-4eaf-97af-3149a9be9e8c
- Data documentation: /data
- Query this programmatically: Deploy MCP
Contractor Kier trialled the Scaled Robotics mobile 3D-scanning progress-monitoring robot at its Harris Academy scheme (a roughly GBP 22m school build) in Bromley, Greater London, at fit-out stage. The robot generated a 3D site map compared against the BIM model for progress and quality monitoring.
Key facts
- Site
- Harris Academy scheme (about GBP 22m school build), Bromley, Greater London
- Contractor
- Kier
- Task
- 3D site scanning compared to the BIM model (progress/QA monitoring)
- Stage
- Fit-out; trial
Safety record
No incidents on record for Scaled Robotics Progress Monitor at Bromley.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-07-12
- Company
- Scaled Robotics
- Status
- pilot
- First seen
- 2018-12-01
- ID
d400f090-44be-4eaf-97af-3149a9be9e8c
Timeline
- Dec 2018First recordedScaled Robotics Progress Monitor first documented operating at Bromley.
- Jul 2026Current status: pilot, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Scaled Robotics Progress Monitor operates in Bromley. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-07-12
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-07-12
Maturity + lifecycle
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Scaled Robotics Progress Monitor at Bromley.Common questions
- What is the Scaled Robotics Progress Monitor deployment at Bromley?
- Scaled Robotics Progress Monitor, built by Scaled Robotics, is recorded as a deployment at Bromley on the DEPLOY registry. Scaled Robotics operates the deployment directly.
- Who operates Scaled Robotics Progress Monitor at Bromley?
- Scaled Robotics, the manufacturer of Scaled Robotics Progress Monitor, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
- When did the Scaled Robotics Progress Monitor deployment at Bromley go live?
- The deployment is recorded as starting December 1, 2018 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
- Have there been incidents at the Scaled Robotics Progress Monitor deployment at Bromley?
- No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.