Deployment
Terafab at White Wing Ranch
Terabase Energy's Terafab is an automated on-site 'field factory' for utility-scale solar construction; it assembles PV panels and tracker torque-tube sub-assemblies and places them on prepositioned mounts using AI-assisted robotics, with a ~2-minute cycle time targeting ~20 MW per week per line.
Terafab by Terabase Energy · Catalog entry · 1 source · not yet field-verified · Construction robots
Recent coverage
- Tesla semiconductor factory to be world’s biggest buildingGlobal Construction Review · 2026-08-13
- Everything’s bigger in Texas: Musk’s planned $16.8 billion chip factory is five times bigger than the world’s current largest buildingFortune · 2026-08-10
- Industry Pulse Newsletter – August 10 2026Automotive World · 2026-08-10
Terabase Energy completed its first commercial deployment of the Terafab automated solar-construction system at the White Wing Ranch solar project in Arizona (a 225 MW project; Terafab installed about 17 MW). Owner/developer Leeward Renewable Energy contracted RES as the EPC.
Key facts
- Site
- White Wing Ranch solar project (225 MW; Terafab installed about 17 MW), Arizona
- Owner/developer
- Leeward Renewable Energy
- EPC contractor
- RES
- Significance
- First commercial Terafab deployment
Exposure
- Customer segment
- construction
- Scale tier
- pilot lt10
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Terafab at White Wing Ranch.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- Terafab
- Company
- Terabase Energy
- Location
- United States/Arizona/White Wing Ranch
- Operator
- Terabase Energy
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 2 to 10 units
- Site environment
- mixed
- Location precision
- verified coordinates
- First seen
- 2023-11-15
- ID
2efc8722-d0c3-413c-b0c2-d7210bbd66b8
Timeline
- Nov 2023First recordedTerafab first documented operating at White Wing Ranch.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Terafab operates in White Wing Ranch. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (1 primary) · last reviewed 2026-08-21
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Terafab at White Wing Ranch.Common questions
What is the Terafab deployment at White Wing Ranch?
Who operates Terafab at White Wing Ranch?
When did the Terafab deployment at White Wing Ranch go live?
Have there been incidents at the Terafab deployment at White Wing Ranch?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/terabase-terafab-white-wing-ranch.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/2efc8722-d0c3-413c-b0c2-d7210bbd66b8
- Data documentation: /data
- Query this programmatically: Deploy MCP