Deployment
Toggle Automated Rebar Platform at Philadelphia
Toggle's full-stack robotics platform fabricates and assembles steel rebar cages using industrial robots, pre-tying cages up to 25 feet for poured-in-place and precast reinforced concrete, cutting rebar labor cost by about 50%.
Toggle Automated Rebar Platform by Toggle Industries · Catalog entry · 1 source · not yet field-verified · Construction robots
Recent coverage
- Construction Robotics Startup Toggle Secures $3 Million in Seed FundingBen Smith, Deploy Editor · 2021-01-01
Toggle Industries' automated rebar platform was used at the Philadelphia Navy Yard, robotically pre-assembling rebar cages for battery-storage foundations, duct-bank reinforcements, about 50 manhole slabs, and aerial-structure foundations for about two miles of electrical cabling. General contractor Miller Bros. reported savings of about 100 working days (roughly five months).
Key facts
- Site
- Philadelphia Navy Yard, Philadelphia, Pennsylvania
- General contractor
- Miller Bros.
- Task
- Robotic pre-assembly of rebar cages (battery-storage foundations, duct banks, manhole slabs, aerial-structure foundations)
- Result
- Saved about 100 working days (roughly 5 months)
Exposure
- Customer segment
- logistics
- Scale tier
- commercial 10 99
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Toggle Automated Rebar Platform at Philadelphia.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Company
- Toggle Industries
- Location
- United States/Pennsylvania/Philadelphia
- Operator
- Toggle Industries
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 11 to 100 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2022-02-01
- ID
def5dc05-9cb1-4ca1-b5ec-07220dcff0df
Timeline
- Feb 2022First recordedToggle Automated Rebar Platform first documented operating at Philadelphia.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Toggle Automated Rebar Platform operates in Philadelphia. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (1 primary) · last reviewed 2026-08-21
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Toggle Automated Rebar Platform at Philadelphia.Common questions
What is the Toggle Automated Rebar Platform deployment at Philadelphia?
Who operates Toggle Automated Rebar Platform at Philadelphia?
When did the Toggle Automated Rebar Platform deployment at Philadelphia go live?
Have there been incidents at the Toggle Automated Rebar Platform deployment at Philadelphia?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/toggle-rebar-philadelphia-navy-yard.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/def5dc05-9cb1-4ca1-b5ec-07220dcff0df
- Data documentation: /data
- Query this programmatically: Deploy MCP