Deployment
Wing Loong II at Pakistan
Chinese medium-altitude long-endurance armed UAV. 32-hour endurance, precision strike capability. Export to Middle East, Africa, and Asia. CASC/CAIG production.
Wing Loong II by CAIG · Catalog entry · 1 source · not yet field-verified · Drones
Recent coverage
- CAIG Wing Loong II - WikipediaBen Smith, Deploy Editor · 2024-01-01
Pakistan Aeronautical Complex and Chengdu Aircraft Corporation jointly produce 48 Wing Loong II UAVs for the Pakistan Air Force. Used in Operation Marg Bar Sarmachar against militants in Iran (January 2024).
Key facts
- Fleet size
- 48 units (joint production)
Exposure
- Customer segment
- logistics
- Scale tier
- pilot lt10
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Wing Loong II at Pakistan.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- Wing Loong II
- Company
- CAIG
- Location
- Pakistan
- Operator
- CAIG
- Status
- operational
- Scale at site
- 2 to 10 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2018-10-09
- ID
3d956347-2be3-483e-9e2e-4b8df2479314
Timeline
- Oct 2018First recordedWing Loong II first documented operating at Pakistan.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Wing Loong II operates in Pakistan. Explore the full verified map:
Sources (1)
- China, Pakistan to jointly produce Wing Loong II UAVs, says report · https://www.janes.com/article/83660/china-pakistan-to-jointly-produce-wing-loong-ii-uavs-says-report · 2018-10-09
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: aerial
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Wing Loong II at Pakistan.Common questions
What is the Wing Loong II deployment at Pakistan?
Who operates Wing Loong II at Pakistan?
When did the Wing Loong II deployment at Pakistan go live?
Have there been incidents at the Wing Loong II deployment at Pakistan?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/wing-loong-2-pakistan.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/3d956347-2be3-483e-9e2e-4b8df2479314
- Data documentation: /data
- Query this programmatically: Deploy MCP