DEPLOYDatabase

Revision history

Stryker Mako SmartRobotics revision history

Every change to this record is dated, sourced, and independently verified where marked. Nothing is edited silently.

Tracked since
Jan 1, 2006
Recorded events
22
Independently verified
11
Last verified change
Jun 11, 2026

Model

Back to Stryker Mako SmartRobotics

Activity

June 2026

  1. MediaJun 11, 2026

    Stryker Mako Robot-Assisted Orthopedic Surgery at Newman Regional...

  2. MediaJun 8, 2026

    Mako 2024 Sizzle Video

  3. CreatedJun 8, 2026

    Added to the verified registry

  4. MediaJun 5, 2026

    Stryker Mako SmartRobotics

February 2026

  1. DeploymentFeb 1, 2026

    at United States (multiple hotel chains)

April 2025

  1. IncidentApr 1, 2025

    Stryker Mako Reamer: screw missing from the reamer handle, located outside the operative...

January 2025

  1. DeploymentJan 1, 2025

    at Ireland

August 2024

  1. IncidentAug 15, 2024

    Stryker Mako acetabular inserter: screw found missing after use (FDA MAUDE)

  2. IncidentAug 7, 2024

    Stryker recalls Mako MICS Handpiece (2024) over a characterization error that can cause...

June 2024

  1. DeploymentJun 1, 2024

    at Global

May 2024

  1. IncidentMay 28, 2024

    Stryker Mako Total Knee software correction over 'error #3' codes when switching...

March 2023

  1. IncidentMar 10, 2023

    Stryker recalls Mako Restoris MCK tibial baseplate trials over incorrect size laser...

January 2023

  1. PriceJan 1, 2023

    Actual sale price

July 2022

  1. IncidentJul 1, 2022

    Stryker Mako bone-registration accuracy recall (Class II, 2022)

November 2020

  1. IncidentNov 11, 2020

    Stryker Mako: persistent instability and pain requiring revision after over-resection...

October 2020

  1. IncidentOct 23, 2020

    Stryker recalls Mako Integrated Cutting System handpiece over checkpoint-verification...

June 2017

  1. IncidentJun 7, 2017

    Stryker recalls Mako RIO over loss of system power mid-procedure

January 2017

  1. DeploymentJan 1, 2017

    at United Kingdom

  2. DeploymentJan 1, 2017

    at Japan (JGSDF Trials)

  3. DeploymentJan 1, 2017

    at Germany

January 2015

  1. DeploymentJan 1, 2015

    at Australia

January 2006

  1. DeploymentJan 1, 2006

    at United States

How this log works

This timeline aggregates every dated signal on the record (creation, deployments, price points, verified media, incidents, and Arc G field changes), newest first. A verified event is independently confirmed; an unverified one is recorded but not yet field-verified. The Arc G field-change log is forward-only: it accrues from Arc G adoption (2026-06-04) and records material changes as they flow through the updateEntityField chokepoint. Nothing is edited silently.

Machine-readable: /models/mako-smartrobotics/history.md + REST /v1/models/af24ae78-30aa-4141-8260-3cde7639e953/history.