DEPLOYDatabase

Robot model

STT Jakarta 2

STT Jakarta 2 is an other robot built by ST Telemedia Global Data Centres.

Form factor
other
Maturity
pilot
Lifecycle
active
Deployments
1

The verified answer

As of Aug 2026, DEPLOY verifies STT Jakarta 2, a other by ST Telemedia Global Data Centres (pilot): 1 verified deployment on record. 1 source back the record.

Deploy Watch

Track STT Jakarta 2 on Deploy.

We notify you when a verified state change lands on the record, not when the company issues a claim.

Pricing

No verified price is on record for STT Jakarta 2. Physical-AI systems are often sold through enterprise contracts or operated as a service rather than at a public list price.

Deployments (1)

STT Jakarta 2 on the deployment map

View the global map

Where STT Jakarta 2 is verified operating. Explore the deployment map by place and type.

Free to use on your site, with a link back to DEPLOY.

Recent activity

Every change to this record is dated, sourced, and independently verified where marked.

Full change history →

Safety record

No incidents on record for STT Jakarta 2.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Sources (1)

  1. https://airtrunk.com/

Common questions

How much does STT Jakarta 2 cost?
STT Jakarta 2's price is not publicly disclosed. DEPLOY has no verified price on record for STT Jakarta 2 from ST Telemedia Global Data Centres. Physical-AI systems like this are often sold through enterprise contracts or operated as a service rather than at a public list price; check the manufacturer for the latest.
Is STT Jakarta 2 actually deployed in the real world?
Yes. STT Jakarta 2 is independently verified in real-world operation on the DEPLOY registry, confirmed at named deployment sites with primary sources: not a concept, render, or demo-only.
Who makes STT Jakarta 2?
STT Jakarta 2 is made by ST Telemedia Global Data Centres, based in Singapore, founded in 2014.
Where is STT Jakarta 2 deployed?
1 verified deployment of STT Jakarta 2 is on the DEPLOY registry, including at Jakarta.
Can you buy STT Jakarta 2?
STT Jakarta 2 is in pilot deployments with named customers and is not yet broadly for sale.
What are alternatives to STT Jakarta 2?
On the DEPLOY registry, comparable other robots to STT Jakarta 2 include BrainOS, 10Beauty Manicure System, CleanSpark Bitcoin Mining Fleet, Hivemind.
How does STT Jakarta 2 compare to BrainOS?
STT Jakarta 2 and BrainOS (Brain Corp · 7 deployments) are both other robots on the DEPLOY registry. STT Jakarta 2 has 1 verified deployment on record. Compare both records for specs, safety, deployments, and verified-vs-claimed autonomy.
What is STT Jakarta 2's maturity stage?
STT Jakarta 2 is at the pilot stage on the DEPLOY maturity ladder (research, prototype, pilot, commercial, production). Pilot stage means at least one named-customer trial deployment is verified.
Is STT Jakarta 2 safe?
STT Jakarta 2 has no incidents on record in the DEPLOY registry. This does not constitute a safety guarantee; it reflects the incidents DEPLOY has tracked and verified to date.
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-27

Verification posture

Unreviewed

Low confidence

Review state

Stable

Last reviewed 2026-08-27

Maturity + lifecycle

Maturity stage: pilot

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for STT Jakarta 2.