DEPLOYDatabase

Revision history

AeiROBOT x Daeduck Electronics PCB deployment revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to AeiROBOT x Daeduck Electronics PCB deployment

Recorded posture

  • First recorded event: 2026-07-28
  • Last material change: 2026-07-28

Material events (1)

  • 2026-07-28: created (source: https://www.thelec.net/news/articleView.html?idxno=12609) (verified)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/aeirobot-x-daeduck-electronics-pcb-deployment/history.md + REST /v1/partnerships/edfeccbb-7309-41f9-a86f-f480fd39f0c6/history.