DEPLOYDatabase

Revision history

HII x Path Robotics x GrayMatter Robotics (HYPR Program) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to HII x Path Robotics x GrayMatter Robotics (HYPR Program)

Recorded posture

  • First recorded event: 2026-04-20
  • Last material change: 2026-04-20

Material events (1)

  • 2026-04-20: created (source: https://hii.com/news/hii-launches-hypr-program-with-path-robotics-and-graymatter-robotics-to-accelerate-production-at-scale) (reported)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/hii-x-path-robotics-x-graymatter-robotics-hypr-program/history.md + REST /v1/partnerships/f09410c1-1a70-4aa7-aef1-f46404f9bf02/history.