Regulation · Operational restriction
Aurora, Colorado passes a data center moratorium through September 2027
Aurora City Council voted unanimously on November 23, 2026 for a temporary data center moratorium. Data centers are prohibited from locating west and south of the intersection of Powhaton Road and Interstate 70 until after Sept. 30, 2027, or until the council determines appropriate land use regulations are in place.
Data centers that already had development applications accepted, including the Trident project, are not affected. The council is working on development code changes including residential setbacks and a noise study requirement.
Jurisdiction: United States/Colorado
Machine-readable surfaces
- Markdown mirror: /regulations/aurora-colorado-data-center-moratorium-2027.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/regulations/673668ce-9fc7-45e3-9b14-36026472b513
- Data documentation: /data
- Query this programmatically: Deploy MCP
Sources (2)
- Aurora City Council passes data center moratorium through September 2027 · https://sentinelcolorado.com/metro/aurora-city-council-passes-data-center-moratorium-through-september-2027/ · 2026-11-23
- Aurora City Council unanimously approves data center moratorium as Vantage drops proposed Trident site · https://www.denver7.com/news/local-news/vantage-drops-plans-for-data-center-after-community-concerns
Common questions
What does Aurora, Colorado passes a data center moratorium through September 2027 cover?
Where does Aurora, Colorado passes a data center moratorium through September 2027 apply?
Is Aurora, Colorado passes a data center moratorium through September 2027 still in effect?
What types of robots does Aurora, Colorado passes a data center moratorium through September 2027 apply to?
Methodology: Verified · 2 sources (no primary) · last reviewed 2026-11-25
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-11-25
Sources by quality tier
- 2
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Aurora, Colorado passes a data center moratorium through September 2027.Canonical ID 673668ce-9fc7-45e3-9b14-36026472b513