ByteDance Pecem Data Center Campus (TikTok)
ByteDance Pecem Data Center Campus is an AI data center campus developed by ByteDance in Ceara, Pecem. 0.90 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · ByteDance · other · Pecem, Ceara, Brazil
Capacity: announced vs energized
Announced-to-energized gap: 0.90 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. 16 months away. Claimed by ByteDance (per reports) (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.90 GW | 2026-07-01 | reported | journalist report |
| Announced | 0.30 GW | 2026-06-01 | reported | journalist report |
| Under construction | 0.20 GW | 2026-06-01 | reported | journalist report |
Key facts
On the data center map
No mappable coordinate is recorded for ByteDance Pecem Data Center Campus (TikTok) yet. Location: Pecem.
The deal
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
Ibiapaba wind complex (Casa dos Ventos), 0.63 GW wind, Under construction. 20-year PPA supplying up to ~300 average MW to phase 1; also draws on Dom Inocencio (Piaui).
Why here
ByteDance Pecem Data Center Campus is in Ceara, Pecem. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Reported total campus investment (~US$39bn)
- $39B journalist report
- Initial 200 MW hub investment (TikTok/Omnia/Casa dos Ventos)
- $9.8B journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedfinancier: Omnia (Patria Investimentos)
- Aug 2026Current: Under construction
Sources
- Casa dos Ventos signs US$2bn TikTok data center power supply deal (BNamericas)
- Casa dos Ventos granted approval to construct TikTok-backed 300MW data center (DCD)
- ByteDance Picks Brazil for Largest Data Center Outside China (Bloomberg)
- ByteDance begins construction of US$38.44bn data center in Brazil (w.media)
- TikTok, Omnia and Casa dos Ventos to invest US$9.8bn in 200 MW data center hub in Pecem (New Energy Events)
f4db62f3-047f-4383-9e2b-f8b82f95b418 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is ByteDance Pecem Data Center Campus (TikTok)?
How much power will ByteDance Pecem Data Center Campus (TikTok) use?
Who is building ByteDance Pecem Data Center Campus (TikTok)?
Is ByteDance Pecem Data Center Campus (TikTok) operating yet?
How verified is the data on ByteDance Pecem Data Center Campus (TikTok)?
Deploy Watch
Track ByteDance Pecem Data Center Campus (TikTok) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). ByteDance Pecem Data Center Campus (TikTok): AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/bytedance-pecem-ceara
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/bytedance-pecem-ceara.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/bytedance-pecem-ceara
- Data documentation: /data
- Query this programmatically: Deploy MCP