Data center comparison
Meta Lebanon Data Center vs Meta Talavera de la Reina Data Center Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta Lebanon Data Center | Meta Talavera de la Reina Data Center Campus | |
|---|---|---|
| Announced capacity | 1 GW | 0.25 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 1 GW | 0.25 GW |
| Lifecycle | under construction | under construction |
| Developer | Meta Platforms | Meta Platforms |
| Location | Lebanon, Indiana, United States | Talavera de la Reina, Toledo (Castilla-La Mancha), Spain |
| Grid | MISO | other |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, Meta Lebanon Data Center or Meta Talavera de la Reina Data Center Campus?
By announced capacity, Meta Lebanon Data Center is larger: 1 GW versus 0.25 GW. Announced figures are claims, not built capacity.
Which is further along, Meta Lebanon Data Center or Meta Talavera de la Reina Data Center Campus?
Meta Lebanon Data Center is under construction; Meta Talavera de la Reina Data Center Campus is under construction. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta Lebanon Data Center and Meta Talavera de la Reina Data Center Campus?
Meta Lebanon Data Center is in Lebanon, Indiana, United States; Meta Talavera de la Reina Data Center Campus is in Talavera de la Reina, Toledo (Castilla-La Mancha), Spain. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.