DEPLOYDatabase

Data center campus

CtrlS Mumbai DC6 & DC7

CtrlS Mumbai DC6 & DC7 is a tracked AI data center campus in Navi Mumbai. Upcoming per operator site

Announced · CtrlS Datacenters · Navi Mumbai


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
CtrlS Mumbai DC6 & DC7 capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Navi Mumbai

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
95 MW (95 MW announced at full build)

On the data center map

No mappable coordinate is recorded for CtrlS Mumbai DC6 & DC7 yet. Location: Navi Mumbai.

The deal

Power

Power source
grid
Interconnection

Why here

CtrlS Mumbai DC6 & DC7 is in Navi Mumbai. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

6ed36498-e6a1-47e8-820b-498d951aa235 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is CtrlS Mumbai DC6 & DC7?
CtrlS Mumbai DC6 & DC7 is an AI data center campus tracked on the DEPLOY registry, located in Navi Mumbai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building CtrlS Mumbai DC6 & DC7?
CtrlS Datacenters is recorded as a party to CtrlS Mumbai DC6 & DC7 on the DEPLOY registry. The full party list, with each role, is on the record.
Is CtrlS Mumbai DC6 & DC7 operating yet?
As of the most recent verification on the DEPLOY registry, CtrlS Mumbai DC6 & DC7 is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on CtrlS Mumbai DC6 & DC7?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track CtrlS Mumbai DC6 & DC7 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). CtrlS Mumbai DC6 & DC7: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/ctrls-datacenters-ctrls-mumbai-dc6-dc7

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces