DataVolt NEOM Oxagon Net-Zero AI Factory

DataVolt NEOM Oxagon Net-Zero AI Factory is an AI data center campus developed by DataVolt in Tabuk (NEOM), Oxagon. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · DataVolt · other · Oxagon, Tabuk (NEOM), Saudi Arabia


Capacity: announced vs energized

Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2028. 28 months away. Claimed by NEOM / DataVolt (source).

DataVolt NEOM Oxagon Net-Zero AI Factory capacity claims
Source
Announced0.30 GW2028-06-01reportedjournalist report
Announced1.50 GW2025-02-01reportedpress release

Key facts

announced

Lifecycle

0.30 GW

Announced

0 GW

Energized

DataVolt

Developer

Saudi Arabia

Location

other

Grid

0.30 GW

Announced-to-energized gap

On the data center map

No mappable coordinate is recorded for DataVolt NEOM Oxagon Net-Zero AI Factory yet. Location: Oxagon.

The deal

developer
DataVolt · Saudi-based sustainable data-center developer, investor and operator; part of its $5B Kingdom commitment
operator
DataVolt
land owner
NEOM (Oxagon) · NEOM giga-project provides the Oxagon site and industrial infrastructure

Power

Power source
solar storage
Grid operator
other
Interconnection

Why here

DataVolt NEOM Oxagon Net-Zero AI Factory is in Tabuk (NEOM), Oxagon. It connects to the other grid, draws on solar storage power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Initial phase investment by DataVolt
$5B press release
First-phase investment (NEOM/DataVolt agreement)
$5B. Feb 2025 investment agreement; first phase toward 1.5 GW net-zero AI factory journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Timeline

  1. Aug 2026
    financial recorded
    capex: First-phase investment (NEOM/DataVolt agreement)
  2. Aug 2026
    Current: Announced

Sources

a5d17766-54b5-4ad0-a87c-7c852eff4f7b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is DataVolt NEOM Oxagon Net-Zero AI Factory?
DataVolt NEOM Oxagon Net-Zero AI Factory is an AI data center campus tracked on the DEPLOY registry, located in Oxagon. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will DataVolt NEOM Oxagon Net-Zero AI Factory use?
DataVolt NEOM Oxagon Net-Zero AI Factory has 0.30 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building DataVolt NEOM Oxagon Net-Zero AI Factory?
DataVolt is recorded as a party to DataVolt NEOM Oxagon Net-Zero AI Factory on the DEPLOY registry.
Is DataVolt NEOM Oxagon Net-Zero AI Factory operating yet?
As of the most recent verification on the DEPLOY registry, DataVolt NEOM Oxagon Net-Zero AI Factory is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on DataVolt NEOM Oxagon Net-Zero AI Factory?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track DataVolt NEOM Oxagon Net-Zero AI Factory on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). DataVolt NEOM Oxagon Net-Zero AI Factory: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/datavolt-neom-oxagon-ai-factory

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces