Data center campus
DataVolt NEOM Oxagon Net-Zero AI Factory
DataVolt NEOM Oxagon Net-Zero AI Factory is an AI data center campus developed by DataVolt in Tabuk (NEOM), Oxagon. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · DataVolt · other · Oxagon, Tabuk (NEOM), Saudi Arabia
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2028. 28 months away. Claimed by NEOM / DataVolt (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2028-06-01 | reported | journalist report |
| Announced | 1.50 GW | 2025-02-01 | reported | press release |
Key facts
On the data center map
No mappable coordinate is recorded for DataVolt NEOM Oxagon Net-Zero AI Factory yet. Location: Oxagon.
The deal
- developer
- DataVolt · Saudi-based sustainable data-center developer, investor and operator; part of its $5B Kingdom commitment
- operator
- DataVolt
- land owner
- NEOM (Oxagon) · NEOM giga-project provides the Oxagon site and industrial infrastructure
Power
- Power source
- solar storage
- Grid operator
- other
- Interconnection
Why here
DataVolt NEOM Oxagon Net-Zero AI Factory is in Tabuk (NEOM), Oxagon. It connects to the other grid, draws on solar storage power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Initial phase investment by DataVolt
- $5B press release
- First-phase investment (NEOM/DataVolt agreement)
- $5B. Feb 2025 investment agreement; first phase toward 1.5 GW net-zero AI factory journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026financial recordedcapex: First-phase investment (NEOM/DataVolt agreement)
- Aug 2026Current: Announced
Sources
- DataVolt and NEOM to develop region's first net-zero AI factory (NEOM newsroom)
- NEOM & DataVolt to build $5 billion net-zero AI factory campus
- NEOM and DataVolt to Build US$5bn Net Zero AI Factory (Data Centre Magazine)
a5d17766-54b5-4ad0-a87c-7c852eff4f7b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is DataVolt NEOM Oxagon Net-Zero AI Factory?
How much power will DataVolt NEOM Oxagon Net-Zero AI Factory use?
Who is building DataVolt NEOM Oxagon Net-Zero AI Factory?
Is DataVolt NEOM Oxagon Net-Zero AI Factory operating yet?
How verified is the data on DataVolt NEOM Oxagon Net-Zero AI Factory?
Deploy Watch
Track DataVolt NEOM Oxagon Net-Zero AI Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). DataVolt NEOM Oxagon Net-Zero AI Factory: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/datavolt-neom-oxagon-ai-factory
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/datavolt-neom-oxagon-ai-factory.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/datavolt-neom-oxagon-ai-factory
- Data documentation: /data
- Query this programmatically: Deploy MCP