DEPLOYDatabase

Data center facility

Aligned Data Centers PHX-13, Glendale

Aligned Data Centers · Glendale · 8805 N. Reems Road, Glendale, AZ. Every figure below is individually sourced and dated.


In clusterArizona(147)

Facility record

under construction

Status

hyperscale

Type

Glendale

Location

72 MW

Critical IT

Arizona Public Service (APS)

Serving utility

On the data center map

Free to use on your site, with a link back to DEPLOY.

Construction evidence

Dated satellite imagery of the site itself, oldest to newest. This is what the campus looks like from orbit over time, not a status we recorded: bare land, grading, and building mass tell their own story. Sentinel-2 true color, 10 m resolution, cloud-free scenes; it shows site-scale change, not fine detail. Click any frame to expand it.

2018-06-17Contains modified Copernicus Sentinel data 2018
2020-09-09Contains modified Copernicus Sentinel data 2020
2022-05-17Contains modified Copernicus Sentinel data 2022
2024-05-26Contains modified Copernicus Sentinel data 2024
2025-07-10Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. How we source and verify it: satellite construction evidence.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 72 MW (claimed) · source
  • record: Aligned Data Centers PHX-13, Glendale (reported) · source
  • servingUtility: Arizona Public Service (APS) (reported) · source · APS building a new 230kV line to the campus
  • status: under construction (per aggregator) (claimed) · source
  • streetAddress: 8805 N. Reems Road, Glendale, AZ (reported) · source · groundbreaking Apr 2025; first of four planned buildings

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Aligned Data Centers PHX-13, Glendale?
Aligned Data Centers PHX-13, Glendale is a data center facility record on the DEPLOY registry, in Glendale. Every fact on the record is individually sourced and dated.
Who operates Aligned Data Centers PHX-13, Glendale?
Aligned Data Centers operates Aligned Data Centers PHX-13, Glendale, per the sourced record on the DEPLOY registry.
Is Aligned Data Centers PHX-13, Glendale operating?
Aligned Data Centers PHX-13, Glendale is recorded as under construction on the DEPLOY registry, with 72 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Aligned Data Centers PHX-13, Glendale?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Aligned Data Centers PHX-13, Glendale on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Aligned Data Centers PHX-13, Glendale: data center facility record. Retrieved August 24, 2026, from https://registry.deploy.report/datacenters/facilities/aligned-phx13-glendale-az

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces