DEPLOYDatabase

Data center facility

AWS Hermiston Livestock Campus (PDX83 / North Valley)

Amazon Web Services · Hermiston. Every figure below is individually sourced and dated.


Facility record

operating

Status

hyperscale

Type

Hermiston

Location

967,900 sqft

Building

2022

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 967900 (reported) · source
  • record: AWS Hermiston Livestock Campus (PDX83 / North Valley) (reported) · source
  • status: operating (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is AWS Hermiston Livestock Campus (PDX83 / North Valley)?
AWS Hermiston Livestock Campus (PDX83 / North Valley) is a data center facility record on the DEPLOY registry, in Hermiston. Every fact on the record is individually sourced and dated.
Who operates AWS Hermiston Livestock Campus (PDX83 / North Valley)?
Amazon Web Services operates AWS Hermiston Livestock Campus (PDX83 / North Valley), per the sourced record on the DEPLOY registry.
Is AWS Hermiston Livestock Campus (PDX83 / North Valley) operating?
AWS Hermiston Livestock Campus (PDX83 / North Valley) is recorded as operating on the DEPLOY registry. Each figure traces to a source.
How verified is the data on AWS Hermiston Livestock Campus (PDX83 / North Valley)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track AWS Hermiston Livestock Campus (PDX83 / North Valley) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). AWS Hermiston Livestock Campus (PDX83 / North Valley): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/aws-hermiston-livestock-campus-or

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces