DEPLOYDatabase

Data center facility

Bitdeer Knoxville

Bitdeer Technologies · Knoxville. Every figure below is individually sourced and dated.


Facility record

operating

Status

crypto hpc

Type

86 MW

Critical IT

2020

Operational

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 86 (reported) · source
  • record: Bitdeer Knoxville (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Bitdeer Knoxville?
Bitdeer Knoxville is a data center facility record on the DEPLOY registry, in Knoxville. Every fact on the record is individually sourced and dated.
Who operates Bitdeer Knoxville?
Bitdeer Technologies operates Bitdeer Knoxville, per the sourced record on the DEPLOY registry.
Is Bitdeer Knoxville operating?
Bitdeer Knoxville is recorded as operating on the DEPLOY registry, with 86 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Bitdeer Knoxville?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Bitdeer Knoxville on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.