DEPLOYDatabase

Data center facility

DataBank MSP1

DataBank · Edina · 7700 France Ave S, Edina, MN 55435. Every figure below is individually sourced and dated.


In clusterHennepin County(20)·Minnesota(63)

Facility record

operating

Status

colocation

Type

DataBank

Operator

Edina

Location

1.35 MW

Critical IT

26,240 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Construction evidence

Dated satellite imagery of the site itself, oldest to newest. This is what the campus looks like from orbit over time, not a status we recorded: bare land, grading, and building mass tell their own story. Sentinel-2 true color, 10 m resolution, cloud-free scenes; it shows site-scale change, not fine detail. Click any frame to expand it.

2018-08-13Contains modified Copernicus Sentinel data 2018
2020-06-05Contains modified Copernicus Sentinel data 2020
2022-07-18Contains modified Copernicus Sentinel data 2022
2024-09-07Contains modified Copernicus Sentinel data 2024
2025-05-05Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. How we source and verify it: satellite construction evidence.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 26240 (reported) · source
  • critical it mw: 1.35 (reported) · source
  • record: DataBank MSP1 (reported) · source
  • status: operating (reported) · source
  • streetAddress: 7700 France Ave S, Edina, MN 55435 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is DataBank MSP1?
DataBank MSP1 is a data center facility record on the DEPLOY registry, in Edina. Every fact on the record is individually sourced and dated.
Who operates DataBank MSP1?
DataBank operates DataBank MSP1, per the sourced record on the DEPLOY registry.
Is DataBank MSP1 operating?
DataBank MSP1 is recorded as operating on the DEPLOY registry, with 1.35 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on DataBank MSP1?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track DataBank MSP1 on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). DataBank MSP1: data center facility record. Retrieved August 24, 2026, from https://registry.deploy.report/datacenters/facilities/databank-msp1-edina-mn

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces