DEPLOYDatabase

Data center facility

Jackson County (Bridgeport) Data Center Expansion

Google · Bridgeport. Every figure below is individually sourced and dated.


In clusterJackson(4)·Alabama(35)

Facility record

announced

Status

hyperscale

Type

Google

Operator

Bridgeport

Location

2019

Operational

Tennessee Valley Authority

Serving utility

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Jackson County (Bridgeport) Data Center Expansion (reported) · source
  • status: announced (reported) · source
  • yearOperational: 2019 (reported) · source · original Bridgeport campus began 2019; this record is the 2026-27 expansion

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: announced

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Jackson County (Bridgeport) Data Center Expansion?
Jackson County (Bridgeport) Data Center Expansion is a data center facility record on the DEPLOY registry, in Bridgeport. Every fact on the record is individually sourced and dated.
Who operates Jackson County (Bridgeport) Data Center Expansion?
Google operates Jackson County (Bridgeport) Data Center Expansion, per the sourced record on the DEPLOY registry.
Is Jackson County (Bridgeport) Data Center Expansion operating?
Jackson County (Bridgeport) Data Center Expansion is recorded as announced on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Jackson County (Bridgeport) Data Center Expansion?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Jackson County (Bridgeport) Data Center Expansion on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Jackson County (Bridgeport) Data Center Expansion: data center facility record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/facilities/google-jackson-county-al-bridgeport-expansion

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces