DEPLOYDatabase

Data center facility

Greenidge Spartanburg South Carolina data center site

Greenidge Generation · Spartanburg. Every figure below is individually sourced and dated.


Facility record

planned

Status

crypto hpc

Type

Spartanburg

Location

60 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: ~152 acres owned; secured access to 60 MW of power for planned GPU/data center development (claimed) · source
  • record: Greenidge Spartanburg South Carolina data center site (reported) · source
  • status: planned; still owned by Greenidge after the Data Journey purchase agreement was terminated Aug 24, 2025 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Greenidge Spartanburg South Carolina data center site?
Greenidge Spartanburg South Carolina data center site is a data center facility record on the DEPLOY registry, in Spartanburg. Every fact on the record is individually sourced and dated.
Who operates Greenidge Spartanburg South Carolina data center site?
Greenidge Generation operates Greenidge Spartanburg South Carolina data center site, per the sourced record on the DEPLOY registry.
Is Greenidge Spartanburg South Carolina data center site operating?
Greenidge Spartanburg South Carolina data center site is recorded as planned on the DEPLOY registry, with 60 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Greenidge Spartanburg South Carolina data center site?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Greenidge Spartanburg South Carolina data center site on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Greenidge Spartanburg South Carolina data center site: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/greenidge-spartanburg-sc

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces